Most of Hillcrest went up between about 1952 and 1965 on a 3:12 or 4:12 roof with eaves you can measure in inches. That single fact — barely a foot of overhang over the picture window — is what decides how a light run gets clipped here, and it is nothing like hanging a two-story gable in a newer subdivision.
The picture window on a Hillcrest ranch sits under about a foot of eave, and the roofline above it is low and long rather than tall and cut up. That is genuinely good news for install speed: no height changes, no second ladder set, one continuous run across most of the front. What it complicates is the clip. There is not much lip to seat on, older five-inch K-style aluminum has often been hung since the house was new, and a gutter with backed-out hangers will not hold a wet strand through a freeze. Where the gutter is tired we clip to the shingle edge instead of loading it and letting ice settle the argument.
The maples, elms and sycamores planted when these blocks were new are well over the roofline now, and a mature canopy standing over a low-pitch roof with five-inch gutter is a bad October combination. The trough packs, the water backs up under the shingle edge, and a light run clipped over that is sitting in ice by January. It is also why the eave line here is worth looking at before install: rust streaking on the fascia below a seam tells you water has been overflowing rather than draining, and that is a repair conversation, not a lighting one. We will tell you if we see it rather than clipping over the top of it.
Every attachment point is a plastic clip; we do not staple, nail or glue anything to your house. On Hillcrest's low-pitch roofs there is barely enough eave to seat a clip in the first place, which is exactly why the wrong one pops loose in the first hard wind and the right one holds all season. Where the gutter lip is too shallow or too chewed up to trust, the run moves to the shingle edge instead. The other thing a short eave changes is sightline: on a single-story ranch the strand sits close to eye level from the sidewalk, so uneven spacing shows badly. Custom-cut runs are what keep the spacing even, and they are the reason we supply the lights rather than stretching a store strand to reach.
The quote covers the lights themselves — commercial-grade LED strands cut to your roofline — plus install, mid-season fixes if a section goes dark in December, January takedown, and off-season storage. Nothing lives in your garage rafters and nothing gets invoiced twice. Straight talk for Hillcrest specifically: a lot of these single-story homes are genuinely DIY-able. Straight front eave, step ladder on flat ground, a box of clips and an afternoon will do it. Where a crew earns the money is a second story, a steep or iced pitch, a roofline chopped into several sections, or simply not wanting to be on a ladder in January taking it all back down.
October or the first week of November is the window. Dry shingles above freezing make the cleanest installs, and routes fill by mid-November. Lights go up in time for Thanksgiving for anyone who books early, and we keep installing into December for people who decide late. Takedown happens in January and it is already in the number — you do not touch a ladder in the cold, and the set goes into our storage rather than your garage. If a section goes dark before then, call or text (208) 453-6760 and we come fix it; that is part of the job, not a service call.
Free, no-obligation quote — we'll call or text you with your price.
Get My Free QuoteStill wondering about something? Call or text us at (208) 453-6760.
Yes, with the right clip. Short eaves are standard across the Bench and we carry clips sized for shallow K-style lip as well as shingle-tab clips for where the gutter will not hold. What does not work is a generic clip forced onto a lip it was not made for, which is how strands end up on the lawn after the first wind.
Honestly, sometimes not. If your front eave is straight and reachable and you are steady on a ladder, this is a reasonable weekend project and we will say so. Where we earn the money on a Hillcrest ranch is the January takedown in the cold, the mid-season fix when a section dies, and never storing a bin of lights again.
We supply them. Every install uses commercial-grade C9 or mini LED strands custom-cut to your roofline. We do not hang store-bought strands — a roof in December is the wrong place to find out a four-year-old set has a dead section, and supplying the lights ourselves is what lets us include mid-season fixes in the quote.
No. Every attachment point is a plastic clip matched to what you actually have — gutter lip, shingle edge or ridge. Nothing is stapled, nailed, screwed or glued. When the lights come down in January there is no evidence they were ever up, which is the whole standard.
Call or text (208) 453-6760 and we come fix it at no charge. That is part of the job, not a separate service call. Commercial-grade strands fail far less than store strings, but wind, squirrels and one crushed bulb still happen — you should not spend a Saturday diagnosing it on a ladder.
We come back, take everything down, and store your set through the off-season, where it gets inspected and repaired before next year. No bins in the garage, no untangling next November, and no second invoice — takedown and storage are already in the quote.
Free, no-obligation quote. Next-day slots available.
Get My Free Quote