Lock your install date by November 1, and settle the power before the design. The Treasure Valley working window runs from mid-October to Thanksgiving, and a 200-foot roofline in incandescent C9s consumes an entire 15-amp circuit. Here is the calendar, the amp math, and the questions worth asking before a deposit.
Two decisions cause most of the December phone calls: booking late, and designing a display the house cannot power. Book by November 1. In the Treasure Valley the working install window runs from roughly the second week of October through Thanksgiving, when shingles are dry and afternoon highs still sit in the 50s and 60s. Boise's average first freeze lands mid-October, and once the valley settles into inversion in late November, north-facing roof planes hold frost past 10 a.m. and stop being safe to walk. The power side is where displays actually get cut down. A 15-amp circuit gives you 1,440 usable watts. Two hundred feet of incandescent C9 at 12-inch spacing draws about 1,400 of them. The same 200 feet in commercial LED C9 draws roughly 150. That single number decides whether you need an electrician before you need an installer.
September is when crews measure, quote, and place product orders, and it is the month you still get to pick a date rather than accept one. October is the work month: dry shingles, highs in the 50s and 60s, and enough daylight to finish a two-story before dusk. Lights go up dark and sit on a timer until you want them lit, so installing early buys a safe roof, not an early season. By December, valley lead times commonly run past two weeks and one storm pushes the whole board back a day. Set the timer against sunset rather than the clock; Boise's earliest sunset is about 5:06 p.m. in the second week of December, and a photocell or astronomic timer follows that drift without resetting. Check your CC&Rs before you settle dates. Master-planned neighborhoods in Meridian and Eagle often set both an install and a removal window.
Run this before you buy a strand. A 15-amp circuit delivers 1,800 watts, but holiday lights are a continuous load, so the working ceiling is 80 percent of that: 1,440 watts, or 12 amps. A 20-amp circuit gives 1,920 watts, 16 amps. Incandescent C9 bulbs draw 7 watts each at 12-inch spacing, so every foot of eave costs 7 watts and 200 feet ends the circuit. Commercial LED C9s draw 0.5 to 0.8 watts, so the same run lands near 150 watts. That gap also sets your chaining limit: the plug on an incandescent set carries a 3- to 5-amp fuse, which stops you at two or three sets end to end, while LED sets often chain 40 or more. SPT-1 zip cord is rated 7 amps, SPT-2 is rated 10. Every outdoor receptacle needs GFCI protection and a while-in-use cover.
How do you attach to the roofline? The only acceptable answer is clips gripping the gutter lip or sliding under a shingle tab. Staples into fascia and nails through architectural shingle both create leaks you will be chasing for years. Can you email a certificate of insurance showing general liability and workers' compensation? Height work belongs on their policy, not your homeowner's. Which circuit are we on, and how many amps is the finished display pulling? A crew that cannot answer has not done the math. Who owns the lights, and what does year two cost? Is a midseason service call included, and how fast, because something fails in the second week of December. Is takedown included, and on what date, in writing at booking. And is the quote per linear foot or per roofline, since a gabled two-story and a wide ranch of the same footprint produce very different numbers.
Full-service seasonal pricing, where the installer supplies commercial product, hangs it, services it, removes it and stores it, commonly runs $3 to $7 per linear foot in year one and drops to roughly $2 to $4 on renewals once the product cost is spent. A 150-foot front roofline therefore lands near $450 to $1,050 the first season in most markets. Buying your own commercial C9 LED runs about $1.50 to $3 a foot in product, plus clips at 10 to 25 cents each and an outdoor timer at $20 to $40, and it lasts eight to ten seasons. Permanent track lighting installed under the eave runs roughly $30 to $60 per linear foot, so $4,500 to $9,000 on that same 150 feet. Reflekt quotes per roofline rather than per foot, with install, takedown and off-season storage in the number. Meridian-based, fully insured, 4.9 stars across 125+ Google reviews.
Here is the part that costs us work. If you own a single-story ranch, the front eave is reachable from a six-foot step ladder, and the footing is level and dry, hang your own. Clips, one good LED C9 run, and a timer is a Saturday afternoon. Hiring out earns its keep on second-story gables and steep rakes where the ladder stands in a flowerbed. Second, do not buy permanent track lighting if you only light the house for six weeks a year. At $4,500 to $9,000 it needs nine or more seasons to beat a seasonal service, and you are betting on the controller and the app outliving the roof. Third, some things no crew solves. If your only exterior receptacle is on the front porch, nobody should run a cord through a window sash to reach the back roofline. That is a $200 to $400 electrician call, and it comes first. Neither do we load a strand onto a gutter already pulling off soft fascia, or put anyone on iced shingles at any price.
Free, no-obligation quote — we'll call or text you with your price.
Get My Free QuoteWhat We Do →
Guide →
Guide →
Guide →
Guide →
Guide →
Guide →
Guide →
Guide →
Still wondering about something? Call or text us at (208) 453-6760.
Book by the first week of November. The Treasure Valley working window runs roughly mid-October through Thanksgiving, when roofs are dry and afternoon highs still sit in the 50s. After late November the inversion brings freezing fog that rimes north-facing planes, and December lead times commonly stretch past two weeks with storm delays stacked on top. Reflekt keeps next-day estimate slots open, but October and early November install dates go first.
It depends entirely on the bulb. Incandescent C9 sets stop at two or three strands, because each 7-watt bulb adds up fast against the 3- to 5-amp fuse built into the plug. Commercial LED C9s draw 0.5 to 0.8 watts, so 40 or more sets often chain safely. Read the tag on the male plug: every manufacturer prints a maximum connected number, and that limit reflects wire gauge, not caution.
Sometimes, and it is far cheaper to know before install day. Count your exterior GFCI receptacles and note where they sit. If you want the back or side rooflines lit and there is no outlet there, adding an exterior GFCI receptacle with a while-in-use cover typically runs $200 to $400. No installer should be solving that with a cord run through a window sash or under a door. Outlet first, lights second.
Usually moisture in a connection rather than a bad breaker. A Class A GFCI trips at 4 to 6 milliamps of leakage, and rain or melting snow wicking into a plug junction gets there easily. Keep every connection off the ground, form a drip loop so water runs away from the plug, use a while-in-use bubble cover, and seal outdoor junctions with dielectric grease. If it trips with the lights unplugged, call an electrician.
Only if you will actually run it beyond December. Permanent track under the eave runs roughly $30 to $60 per linear foot installed, so $4,500 to $9,000 on a 150-foot roofline, against $450 to $1,050 for a first seasonal install and less on renewals. That is nine or more seasons to break even. It pays off for people who light the house for several holidays and for accent lighting year-round, not for six weeks of Christmas.
Yes, and you pay for labor only. We will inspect the set first and tell you plainly what is not worth putting on a two-story roof for a full season. Incandescent sets past five or six years, any cracked or chalky jacket, and green corrosion in the sockets all belong in recycling rather than on your eave. Half the midseason service calls anyone runs are chasing one tired strand in an old set.
Free, no-obligation quote. Next-day slots available.