344 Hubble Homes rooflines went in at Ustick Road and Indiana Avenue, most with a two-story entry gable out front — and with landscaping only a few years old, almost nothing stands between those peaks and the west wind off the open ground toward Middleton Road. That wind is what we build a Greenmont light run around.
Most of these 344 houses share a front elevation: a two-story entry gable over stacked entry glass, a lower eave running out to the garage, and vinyl or hardboard lap siding underneath it all. That gable is the shape people want lit — it's the whole face of the house from the street — and it's also the part homeowners shouldn't be reaching themselves, because the peak sits well above where a garden-variety ladder wants to be. We run commercial-grade C9 or mini LED strands, custom-cut to your actual eave and rake lengths, so the line turns the corner at the garage return and climbs the rake without a doubled-up loop where a boxed strand ran long. Every section gets labeled to the house — front eave, left rake, right rake, garage — which is what makes the second year go up in a fraction of the first year's time.
Greenmont's trees are two or three years in the ground. That matters for lights the same way it matters for the field dust on your windows: there's no mature canopy slowing down what the west wind carries across the open ground past Middleton Road, and a light strand on an exposed west-facing rake takes that wind all season. A loose, sagging run from a big-box kit is what ends up slapping the fascia in a December gust. Our answer isn't hardware — it's spacing. Clips go on tighter intervals on exposed elevations so the strand can't build up slack and start moving, and C9 sockets sit on the line evenly so the run reads straight from the street instead of scalloping between attachment points. Same clips, placed like the wind is real, because out here it is.
Everything attaches with plastic clips sized to what they're gripping: gutter clips along the eave and garage return, shingle-tab clips up the gable rakes. No staples, no nails, no screws, no adhesive — on siding and roofing this new, we're not going to be the first ones to put a hole in it. Timing matters for the same reason. Caldwell frosts hard once the season turns, and cold shingle tabs get brittle; a clip forced under a stiff tab can crack it where a warm tab takes it cleanly. So we hang Greenmont from October into the first week of November while the roof is still warm and dry, and the lights simply sit dark until you flip them on — most people wait for Thanksgiving week. Booking early isn't about wanting Christmas in October. It's about shingle temperature.
We supply the lights on every job — commercial-grade C9 or mini LED, cut to the roofline — and we don't hang customer-owned or store-bought strands. That's not gatekeeping; old boxed strands fail in sections, almost always in late December, and we can't stand behind a product we didn't supply. Because the strands are ours, mid-season repairs are on us: a section goes dark, you call, we come fix it, no charge. The honest flip side: if you're in one of Greenmont's single-level plans on an interior lot, with a walkable eave and no rake work, you can reasonably DIY a decent light line off a step ladder, and we'd rather say that than pretend otherwise. Where we earn the job is the two-story entry gable — the height, the wind exposure, and the January takedown nobody enjoys.
Holiday lighting is quoted per roofline, free, after we've seen the house — a two-story entry gable and a single-level ranch two doors down are not the same job, so we don't price them like they are. The number covers the lights themselves, the install, mid-season repairs, takedown in January, and off-season storage, where your cut sets get inspected before next fall. Nothing goes in your garage and nothing gets untangled next November. Check your CC&Rs before you pick colors or dates — we build to whatever your association allows, and since install and lighting-up are separate events, an October install still fits a December display window. Reflekt was founded in April 2025 by Hunter Stevens and Ethan Seusy, is locally owned and fully insured, and holds 4.9 stars across 125+ Google reviews. Call or text (208) 453-6760 before the routes fill.
Free, no-obligation quote — we'll call or text you with your price.
Get My Free QuoteStill wondering about something? Call or text us at (208) 453-6760.
Book in October or the first week of November. We hang Greenmont while shingles are still warm and dry — cold tabs crack when a clip goes under them — and the lights sit dark on the house until you want them on, usually Thanksgiving week. Routes fill by mid-November. We install through December for late deciders, but you're then betting on a warm, dry window that some years never shows up.
Yes — that gable is most of what we hang in Greenmont, and it's exactly the height where homeowner ladder work stops being reasonable. We set ladders properly and work the rake in cut sections rather than dragging a strand across the shingles. If something about your specific lot complicates access, we flag it at the quote, not on install day.
That's the right question for this subdivision. With young landscaping and open ground west of Middleton Road, exposed rakes take real wind all season. We run commercial-grade strands on tighter clip spacing on exposed elevations so the line can't build slack and start slapping the fascia. If a section does fail mid-season, the fix visit is included — call and we come out.
No — plastic clips only, sized to the gutter lip or the shingle tab, and no staples, nails, screws, or adhesive anywhere on the house. The real damage risk is cold-weather installs, when brittle tabs crack under a forced clip. That's why we push Greenmont installs into October and early November instead of hanging in December cold.
No, and we'll tell you why straight: store-bought strands a few seasons old fail in sections, almost always right at Christmas, and we can't guarantee a product we didn't supply. Every install uses our commercial-grade C9 or mini LED sets, custom-cut to your roofline — and because they're ours, mid-season repairs are included at no charge.
One per-roofline quote covers the lights, the install, any mid-season repairs, takedown in January, and off-season storage with an inspection before next season. Your sets stay cut and labeled to your house — front eave, rakes, garage — so year two is a repeat, not a redesign. The quote is free; call (208) 453-6760 and we'll come measure.
Free, no-obligation quote. Next-day slots available.
Get My Free Quote